We engineer systems to meet your load, airflow, and acoustic targets while minimizing lifecycle cost.
- Design: Cooling/Heating Load Calc, ESP & static pressure, CFM sizing, diversity, and ventilation per space use.
- Ducting: GI/PI sheet-metal, round/rectangular, slip & drive/slide-on flanges, turning vanes, access doors.
- Airside: VAV/CAV boxes, volume control & fire dampers, sound attenuators, grilles & diffusers selection.
- Insulation: PIR/PU boards, rockwool blankets, closed-cell elastomeric; vapor barrier and condensation control.
- Controls & IAQ: CO2 demand control, pressure monitoring, filtration strategies (G4–F7), fresh air integration.
- Balancing & T&C: TAB procedures, leakage classes, instrumentation and handover documentation.
We deliver to Malaysian codes and accepted industry best practices.
- Codes & Guidelines: Coordination with local authority requirements and M&E consultant standards.
- Safety: Risk assessments, method statements, hot-work permits, working at height, and lockout/tagout.
- Fire Strategy: Proper placement of fire/smoke dampers and firestopping around penetrations.
- Coordination: BIM/2D shop drawings for clashes, ceiling coordination with lighting/sprinklers.
Note: We do not claim certifications not provided; we meet or exceed consultant-specified requirements.
Quality Assurance & Commissioning
- Materials verification and gauge checks against submittals.
- Leakage & pressure tests by section; damper functional tests.
- TAB: Airflow measurement, balancing to setpoints, and noise checks.
- Handover: As-builts, O&M manuals, test reports, and training.
- Sheet Metal: GI/PI with typical gauges 26–18G based on size/pressure; lock-forming quality.
- Sealing: Class A–C per leakage targets using solvent-based sealants and reinforced tapes.
- Support & Suspension: Angle iron trapezes, drop rods, anti-vibration isolators, seismic considerations where required.
- Coatings: Zinc-aluminum, epoxy primers, and anti-corrosion topcoats suited for Malaysian humidity.
- Insulation Detailing: Proper staggered joints, mechanical fasteners, and vapor barrier continuity.
- Hygiene: Clean fabrication practices, end capping during transport, dust control on site.
- Discovery & Site Survey: Discuss scope, review drawings, capture constraints, and measure existing conditions.
- Engineering Design: Loads, ESP, duct routing, equipment schedules; submit for consultant approval.
- Fabrication: Shop drawings, material procurement, and precision sheet-metal fabrication.
- Installation: Safe execution, coordination with trades, leak control, insulation, and accessories.
- Testing & Commissioning: TAB, function tests, documentation, training, and handover.
What lead times can we expect?
Typical projects range 3–8 weeks from approval to T&C, depending on scope, material availability, and site access.
How do you handle tight site constraints?
We coordinate staging windows, modularize duct sections, use night shifts if required, and protect finished areas.
Do you provide maintenance?
Yes. Preventive maintenance and periodic balancing are available with service-level agreements.
Can you work with our consultant or main contractor?
Absolutely. We align to consultant specs, submit drawings for approval, and integrate with the main contractor’s programme.
Share your drawings, target CFM/ESP, and site constraints for a fast, engineered proposal. Since 2016, we’ve delivered high-scale cooling solutions for industry and commerce in Malaysia.
- ‘No Cold, No Pay’ approach adapted to ducted performance targets.
- 45-day workmanship warranty on every installation.
- Single point of contact from design through commissioning.
Prefer to talk? Call +60 11-2837 1528 or email info@michoconstruction-tech.net